Generator, Panels and Switchgear for emergency power supply to Data Centre in Milton Keynes

Generator, Panels and Switchgear for emergency power supply to Data Centre in Milton Keynes

A Loadgen client required maintenance on their on-site generator.

To cover the power needs of the Milton Keynes Data Centre, we installed one of our 640Kva Power Cubes. This was one of two generators that was installed to cover power outages while our engineers replaced the current generator's switchgear.

Not only did we cover the emergency power for the successful maintenance, but we also built and installed the controls panels and switchgear. 

16 Jan 2018